Contracting a pilot plant is a viable approach for any organization. However, it can be fraught with potential issues, which need to be understood and addressed in advance Reduced in-house resources have limited the options many organizations have for designing…
In some situations, it might be necessary to remove or replace a bolt during operation. This article shows how to determine the proper bolt load to prevent leaks Bolted flange joints (Figure 1) are part of pressure vessel and piping…
Improved understanding of differential pressure (DP) flowmeter operation, along with best calibration practices, reduces maintenance errors Utilizing an orifice plate installed in a pipe and accurately measuring the differential pressure (DP) to calculate flow is one of most common methods…
Storage tanks containing hazardous materials require safety instrumented systems (SIS) to prevent overfills. Digital technology in the latest level-measurement devices used in SIS enables remote proof-testing, which provides significant advantages At industrial facilities with tanks containing hazardous, flammable or explosive…